国产精品一区二区在线观看_国产视频久久久_在线观看成人_亚洲成人一区二区三区_日韩国产精品一区二区三区_久久社区

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!

s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!


 Atomic ash (also known as unsaturated polyester putty) is an indispensable surface filling and repair material in daily industrial fields such as automobile maintenance, furniture manufacturing, and ship repair. It is widely recognized by users for its excellent filling, polishing, adhesion, and rapid curing properties. Changxing Baodi Environmental Protection Technology Co., Ltd., as a professional manufacturer of atomic ash, has always been committed to providing customers with high-quality products and practical solutions. 

Atomic ash is mainly composed of unsaturated polyester resin, fillers (such as talc powder), a small amount of additives, and supporting curing agents. Its core advantages lie in:
1. Strong filling ability: It can effectively fill defects such as dents, sand holes, and welds on substrates such as metal and wood.
2. Fast drying speed: When used in conjunction with a curing agent, it can harden in a short period of time, significantly improving work efficiency.
3. Good polishing performance: After curing, the hardness is moderate and easy to polish flat, providing a good foundation for subsequent spraying.
4. Excellent adhesion: It has good adhesion to substrates such as metal and wood that have been properly treated.
5. High stability: High quality atomic ash has low shrinkage rate and is not easy to crack or fall off.
Today, Changxing Baodi Environmental Protection Technology Co., Ltd., a manufacturer of atomic ash, received a call from a user asking: What should I do if the atomic ash dries too quickly? Let me explain briefly below
The rapid drying of atomic ash can be solved by adjusting the mixing method, controlling the proportion of curing agent, and optimizing the construction environment. The main reasons include excessive curing agent, high ambient temperature, or excessive mixing amount. Targeted measures such as small and multiple mixing, appropriate reduction of curing agent addition ratio (not exceeding the lower limit), and lowering construction temperature need to be taken. ‌‌‌‌
Adjust the allocation method and proportion
Small amount and multiple blending: calculate the single dosage according to the gel time of the putty, so as to avoid too much one-time blending that will lead to curing before use up. It is recommended to control the amount of each blending within 5-10 minutes. ‌‌‌‌
Reasonably control the proportion of curing agent:
Within the recommended curing agent ratio range by the manufacturer (usually 1.5% -3%), reduce the amount added appropriately to slow down the drying speed, but ensure that it is not lower than the minimum ratio requirement to avoid not drying. ‌‌
Attention: Excessive curing agent is one of the main reasons for rapid drying, and it is necessary to strictly follow the instructions for proportioning.
Optimize the construction environment
Temperature control: High temperature will accelerate the solidification of atomic ash. It is recommended to carry out construction in an environment of 15-25 ℃, avoiding direct sunlight or using heating equipment. ‌‌‌‌
Thin scraping treatment: Adopting a layered thin scraping method, with each layer thickness not exceeding 3mm, shortening the single construction time and reducing the risk of rapid local curing. ‌‌
Other auxiliary measures
Choose slow drying products: If the conventional atomic ash drying speed is too fast, it can be replaced with slow drying models or customized products. ‌‌
Pre treatment of board: Ensure that the construction surface is free of oil and water stains, and avoid accelerated drying caused by abnormal reaction between atomic ash and substrate due to pollution.
The atomic ash produced by Changxing Baodi Environmental Protection Technology Co., Ltd. strictly controls the quality of raw materials and production processes to ensure stable and reliable product performance. We understand that every detail in construction is related to the final outcome. If you encounter the problem of rapid solidification of atomic ash, please do not worry and refer to the above suggestions for adjustment. If the problem persists or you have any questions about product selection, please feel free to contact Changxing Baodi's technical service team at any time. We will wholeheartedly provide you with professional technical support and solutions.
Choose Changxing Baodi Atomic Ash for an efficient and reliable surface repair experience!
Kind reminder: Please refer to the product manual of Changxing Baodi Atomic Ash that you are using for specific operations. Please wear protective equipment during construction to ensure safe operation.


Prev:No data!
NextAnalysis of Atomic Ash Shaping Technology

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 一级免费看片 | 国产91一区二区三区 | 久久99精品久久久久久236 | 欧美不卡三区 | 久久爽精品区穿丝袜 | 成人欧美视频 | 久久久久久精 | 久久久日韩精品一区二区三区 | 久久精品视频3 | 美女被免费网站在线软件 | 久久精品.com | 99久久电影 | 精品免费在线视频 | 一级做a爰片性色毛片2021 | 久久国产精品久久精品国产演员表 | 黄色毛片视频在线观看 | 天天操综 | 男女羞羞视频在线观看免费 | 破处av在线 | 日韩美香港a一级毛片免费 欧美一级淫片007 | 久久精品中文字幕一区二区三区 | 久久成人午夜视频 | 在线亚洲综合 | 色视频欧美 | 91精品国产综合久久青草 | 久久最新网址 | 玖草| 日韩av影片在线观看 | 狼人狠狠干 | 日本高清电影在线播放 | 蜜桃网站在线观看 | 精品国产一区二区三区天美传媒 | 一区二区三区视频在线观看 | 欧美18一19sex性护士农村 | 成人午夜免费在线视频 | 天天草天天色 | 91久久久久久久久久久久久 | 在线成人看片 | 日韩精品久久久久久久九岛 | 91看片网页| 草b视频在线观看 |